Please scroll down, To apply

Project Controls Analyst (Financial analyst and Scheduler for Earned Value)

hiring now

FCFC

2021-12-04 07:30:03

Job location Akron, Ohio, United States

Job type: fulltime

Job industry: Banking & Financial Services

Job description

Seeking individual with a minimum of a bachelor's degree in finance, engineering, construction, or related degree with heavy experience in financial analysis (forecasting, cost analysis, earned value, etc) and scheduling using P6 software with the ability to load schedules and create critical path based schedules specifically. Construction knowledge/background is a plus but also not the priority experience for the position as this position is mainly financial analysis and scheduling heavy with the current initiative of the company based in Earned Value analysis.

This job is full-time with health benefits and PTO. We are currently hiring analysts for positions based in Akron, OH and Greensburg, PA though the position is currently Work From Home.

Job Types: Full-time, Contract

Pay: $50,000.00 - $70,000.00 per year

Benefits:

  • 401(k)
  • Flexible schedule
  • Health insurance
  • Paid time off
  • Professional development assistance

Physical Setting:

  • Office

Schedule:

  • 8 hour shift
  • Monday to Friday

Supplemental Pay:

  • Bonus pay

Ability to commute/relocate:

  • Akron, OH: Reliably commute or planning to relocate before starting work (Preferred)

Education:

  • Bachelor's (Preferred)

Experience:

  • Accounting: 1 year (Preferred)
  • Microsoft Excel: 5 years (Required)

Willingness to travel:

  • 25% (Preferred)

Work Location: Multiple Locations

Inform a friend!

Top